Job Executed
Name of the Project |
Location |
Client |
Consultant |
Approval Authority |
Main Contractor |
Period |
Details of the Work |
33/11 KV Primary Substation at Al Mawaleh North |
Al Mawaleh North - Sultanate of Oman |
Muscat Electricity Distribution Company |
Energo Projekt Entel LLC. |
Energo Projekt Entel LLC. |
Larsen & Toubro (Oman) LLC |
2007 Dec |
Pile Design & Execution of 33 Nos. of 500mm dia piles of length 13m (Static Load Test Preliminary 1 no and Working Pile Load Test -1No)- Work Completed |
DGB 073/07 of Qurum to Sarooj Road Improvements for Muscat Municipality |
Qurum to Sarooj Link road -Muscat |
Muscat Municipality |
WS Atkins International Co |
WS Atkins International Co - Muscat Municipality |
Federici Stirling Batco LLC |
2008 Jan |
324 nos of 900mm dia piles of length 20m(Preliminary- Static load Test-2 nos & Lateral Load test -2nos)-Work completed. |
Shadeed Iron & Steel-Material Handling System |
Sohar - Sultanate of Oman |
Shadeed Iron & Steel Plant Sohar-Sultanate of Oman |
Triad Oman |
Shadeed Iron & Steel Plant Sohar-Sultanate of Oman |
Douglas OHI |
Feb-08 |
Pile Design & Execution of 80 Nos. of 900mm dia piles of length16 m (static Load Test Preliminary 1 nos , Working Pile Load Test -1Nos). Work completed |
Shadeed Iron & Steel-Material Handling Systeem-Sub Station |
Sohar - Sultanate of Oman |
Shadeed Iron & Steel Plant Sohar-Sultanate of Oman |
Triad Oman |
Triad Oman /Shadeed Iron & Steel Plant Sohar-Sultanate of Oman |
Douglas OHI |
Feb-08 |
Pile Design & Execution of 25 Nos. of 600mm dia piles of length12 m/14 m. Work Completed |
Proposed Residential Complex at Qurum |
Al Qurum |
H.E.Salim Macki |
Triad Oman |
Triad Oman |
Special Technical Services LLC |
Jul-08 |
Pile Design & Execution of 56 nos of 600 mm dia piles of length 12m ( static working pile load test -1 no)-Work completed |
Refurbishment & Extension of reception Building sea wall |
Muscat- Sultanate of Oman |
Mr.Salam Bin Ahmed Bin Mohd.Al Ghazali |
Consulting Engineering Service LLC |
Consulting Engineering Service LLC |
Al Manar International |
Sep-08 |
50 Nos. of 1000mm dia piles of length 16m- Work completed |
Cyclone Damages Rehabilitation Works |
A'seela Ras-Al-Hadd |
Consolidated Contractors Co. LLC |
Parsons LLC |
Parsons LLC |
Consolidated Contractors Co. LLC |
Dec-08 |
152 Nos of 750 mm dia, 10.5 mTo 20.5 m length-.Static Working Pile Load Test -8 Nos. Work Completed |
Construction of Ship Repair Yard and Dry Dock Complex |
Duqm Port |
Galfar |
DSME |
DSME |
Galfar Engineering & Contracting Company |
April 09 to Nov 09 |
7 Months |
Pre cast pile of dia 400 and 500. 800 nos. – Work completed |
Sohar Pelletizing plant @ Sohar-piling work |
Sohar - Sultanate of Oman |
Vale |
Essar Engineering Services Ltd. |
Essar Engineering Services Ltd. |
Galfar Engineering & Contracting Company |
Feb-09 to May-09 |
3 Months |
500 mm Ø – 16 m depth- 24 Nos 600 mm Ø – 16 m depth - 476 Nos (Static Working Pile Load Test – 4 Nos) Work completed |
Seeb Waste Water Project |
Seeb |
HAYA |
Parsons International Company LLC |
Parsons International Company LLC |
Al Hassan / Al Ansari
|
June 09 to Aug 09 |
2 Month |
750 mm Ф -24 m depth -26 Nos, Work completed |
Royal Court Complex at Muscat |
Al Khuwair |
Ministry of Justice |
Consulting Engineering Service LLC |
Consulting Engineering Service LLC |
Carillion Alawi LLC |
Jul 09 To October 09 |
2.5 months |
450 mm Ф -12.8 m depth -605 No’s , static Load Test Preliminary 1 no & Static working pile load test 6 Nos.Work completed |
Duqm Desalination Plant |
Duqm |
VA TEC |
Energo Projekt Entel LLC. |
Energo Projekt Entel LLC. |
Larsen & Toubro Electromech LLC |
July 09 to Sep 09 |
2 Month |
750mm Ф -13 m depth -89 No’s,(Secant Piles, Sheet Piles&Anchoring ). Work completed |
A’Seeb Waste Water Project |
Seeb |
HAYA |
Parsons International Company LLC |
Parsons International Company LLC |
Gulf Petrochemical Services Trading |
August 09 to Feb 10 |
6 Months |
600 mm Ф -14 m depth -675 Nos, (Secant Piles,) Work in Completed. |
Construction of Sewerage system for Coastal,Darsait. Aynt,Wadi Kabir |
Darsait, Aynt |
HAYA |
Energo Projekt Entel LLc |
Energo Projekt Entel LLc |
Al Ansari Trading Contracing LLC |
Nov 09 |
25 days |
700 mm Ф -33Nos,(Secant Piles) Work completed |
Sohar Pelletizing Plant |
Sohar |
Vale |
Essar Engineering Services Ltd |
Essar Engineering Services Ltd |
Al Nuaimi Foundation LLC |
Nov 09 to Jan 10 |
03 Months |
750mm Ф -12 m depth -282 Nos Work Completed |
Civil Works for ORPC-Sohar |
Sohar |
ORPC |
Daewoo Engineering |
Daewoo Engineering |
Larsen & Toubro Electromech LLC |
May 2010 |
30 days |
600mm dia-17m depth-72 Nos Work Completed |
Piling Works at Additional Classrooms of Al Ohoud Basic School at Al Suwaiq |
Al Suwaiq |
Ministry of Education |
Ministry of Education |
Ministry of Education |
Modern Technology Co.LLC |
July 2010 |
3 weeks |
600mm dia ,13m length ,26 Nos Bored Cast –in Situ Piles& 26 Nos Low strain Integrity Test. Work Completed |
Dewatering Well drilling &Installation Works at Construction of MPS3 Sewerage Network at Seeb |
A Seeb |
Muscat Municipality |
Parsons International Company LLC |
Parsons International Company LLC |
Al Hassan Engineering Co.SAOG |
15 August 2010 |
1 Week |
Drilling & Installation of 02 Nos of Dewatering Wells of 750mm dia & 24m deep. Work Completed |
Piling work at Mechanized Car Parking at Al Khuwair |
Al Khuwair |
Shaikh Musallam Salem Musallam Bin Ham Al Ameri |
Space Designers International LLC |
Space Designers International LLC |
Silver Shell Trading & Contracting LLC |
09 November 2010 |
3 weeks |
Drilling & Installation of 18m length and 24 nos of cast in situ Piles, Low strain Integrity test for all piles. Work Completed |
Piling, Shoring and Dewatering work for Residential and commercial building at Seeb |
A Seeb |
Rashid,Mohd & Ali Khamis Al Alawi
|
Gulf Engineering Consultancy |
Gulf Engineering Consultancy |
Dolphin Trading & Investment LLC |
November 2010 |
6 Months |
Drilling & Installation of 15m length, 170 nos of Bored Cast in Situ Piles including Static & Integrity test,H-Pile shoring and dewatering works. Work Completed. |
Design and Piling Works at 220 KV New Sohar Grid Power Station. |
Sohar Port |
Oman Electricity Transmission Company LLC |
Energo Projekt Entel LLC |
Energo Projekt Entel LLC |
Larsen & Toubro (Oman) LLC |
January 2011 |
1 Month |
Drilling & Installation of 11.3M & 10.9M length, 500mm dia, and 102nos of Bored Cast in Situ Piles & Integrity test. Work Completed. |
Piling Works at Al Ahnaf Bin Qais School at Sur Hayyan-Al Suwaiq |
Al Suwaiq |
Ministry of Education |
Bisan Engineering Consulting Office |
Bisan Engineering Consulting Office |
Marmul Contracting & Trading LLC |
February 2011 |
3 Months |
Drilling & Installation of 14m length, 600mm dia, and 317nos of Bored Cast in Situ including Integrity test. Work Completed. |
Design and execution of Piling works for Palm Tree Monopole Tower at Wave Muscat |
Wave Muscat |
Wave Muscat |
Parsons International Company LLC |
Parsons International Company LLC |
Tawoos Power &Telecommunications LLC |
February 2011 |
02 Days |
Design, drilling and installation of 900mm dia, 25 m length Bored Cast in Situ pile. Work Completed. |
Dewatering Works at Royal cavalry Proposed Development at Al Adiyat |
Al Adiyat |
Royal Court Affairs |
Royal Court Affairs |
Royal Court Affairs |
Almest Contracting Company LLC |
May 2011 |
01 Month |
Design, installation and maintenance of Dewatering System of 163LM. Work Completed. |
Piling Works at ATuffail Bin Amr School at Al Owaid, Al Musanna |
Al Musanna |
Ministry of Education |
Bisan Engineering Consulting Office |
Bisan Engineering Consulting Office |
Al Badi Trading & Contracting LLC |
July 2011 |
3 Months |
Drilling & Installation of 14m length, 500mm dia, and 336nos of Bored Cast in Situ including Integrity Test. Work Completed. |
Piling Works for the Proposed Chinese Embassy Building at Al Khuwair |
Al Khuwair |
China Embassy |
Beijing Fangyuan Supevisor & Conctruction Company |
Beijing Fangyuan Supevisor & Conctruction Company |
The China Tiesiju Civil Engineering Group Co Ltd |
Oct 2011 |
01 Month |
Installation of Test Piles 05 No CFA Piles of 450mm Dia & Static Load Testing 05 Nos. Work Completed. |
Piling Work for the Proposed Vale Oman Conveyor TR-01-20 |
Sohar |
Vale Oman |
Worley Parsons Oman |
Worley Parsons Oman |
Al Batina International LLC |
Dec 2011 |
01 Month |
Installation of 77 Nos of 600mm Dia CFA Piles & Static Load Test 02 Nos. Work Completed. |
Piling Work for the Proposed SMS Plant in the Shadeed Iron and Steel Plant. |
Sohar |
Shadeed Iron and Steel LLC |
IDOM |
IDOM |
- |
Nov 2011 |
06 Months |
Installation of 1465 bored Cast in Situ Piles of various diameter ranging from 600 to 1200mm dia.600 dia piles 90 Nos 12m Lengths, 750 dia pile 448 Nos 13m Length, 1000mm dia 765 piles 14m lengths, 1200 dia piles 165 Nos 15m lengths - Work Completed. |
Shoring Work for the Proposed PASI Mixed Use Development in Bausher. |
Muscat |
Public Authority of Social Insurance |
Dar Al Handasah |
Dar Al Handasah |
Deebaj National Enterprises LLC |
Aug 2012 |
04 Months |
160LM of Secant Pile Shoring of 500mm Dia pile with one layer of anchors – Work Completed |
Piling Work at the Proposed Blast Resistant Operator Shelter in ORPIC. |
Sohar |
ORPIC |
TR Engineering |
TR Engineering |
Al Batina International LLC |
Oct 2012 |
01 Month |
256 No of Bored Cast in Situ CFA Piles of 500mm Dia – Work Completed |
Piling Work in the Proposed Interchanges between Muscat International Airport and Expressway. |
Muscat |
Muscat Municipality |
Parsons International Company LLC |
Parsons International Company LLC |
Soares Da Costa |
Dec 2012 |
08 Months |
555 No of Bored Cast In Situ Piles of 750 dia of Various lengths – Work Completed |
Shoring Work in the Proposed Resi Comml Building Plot 157 in Azaiba |
Muscat |
Mr.Haider Mr.Faiq Dawood Mrs. Noor Jehan |
Space Designers International LLC |
Space Designers International LLC |
North Ocean Enterprises LLC |
May 2013 |
01 Months |
120 lm of Shoring with 600mm dia Secant Piles - Work Completed |
Damage Control Simulator for the Royal Navy of Oman |
Musanna |
Ministry of Defence |
Royal Navy |
Royal Navy |
Geosol Engineering LLC |
June 2013 |
15 days |
112 No of CFA Piles of 450 and 600mm dia - Work Completed |
Al Ghubra IWPP Plant |
Muscat |
Muscat City Desalination Co |
Mott Mcdonald |
Mott Mcdonald |
Geosol Engineering LLC |
June 2013 |
02 Months |
Secant Pile 168 Nos of 800mm dia and 600mm dia - Work Completed |
Piling Work for the Mosque at Al Qurm |
Muscat |
Awkaf Al Jaffaria |
Engineering Studies Office |
Engineering Studies Office |
Mustafa Ahmed Salman Trading |
June 2013 |
02 Days |
04 Nos of CFA Bored Cast In Situ Piles of 600mm dia for the Tomb - Work Completed |
Piling Work for the Proposed OICT Building Phase1 |
Sohar |
OICT |
Mott Mcdonald |
Mott Mcdonald |
China Harbour Engineering Co LLC |
Sep 2013 |
01 month |
104 Nos of CFA Bored Cast In Situ Piles of Dia 600mm of length 16m & 12m - Work Completed |
Pile Testing Work in the Proposed Royal Oman Police Building |
Sohar |
ROP |
|
|
TMF Euro Foundations LLC |
Nov 2013 |
01 Month |
07 Nos Static Load Testing of the Piles. Work Completed |
Shoring Work for the Proposed Energy Center Al Wattayah |
Muscat |
Ministry of Health |
Arcop |
Arcop |
Bahwan Contracting Company LLC |
Nov 2013 |
01 Month |
215m of Shoring with Soldier Piles and Concrete Panels - Work Completed |
Shoring Work in Proposed Remal Castle |
Bausher |
Sheik Amer Bin Ahmed Suleimani |
Leeyana |
Leeyana |
Arkan Majan International LLC |
May 2014 |
04 Months |
110m of Contiguous Pile Shoring with Depth of Excavation 10.5m - Work Completed |
Piling Work in the Proposed PAC Duqm Project |
Duqm |
Renaissance Services SAOG |
PWA / CPEC |
PWA / CPEC |
NA |
Dec 2014 (Completion Date) |
08 Months |
1645 Nos of Piles of Dia 600mm & 750mm Bored Cast In Situ Piles - Work Completed |
Displacement Pile for Wave Muscat |
Wave Muscat |
Wave Muscat |
|
|
APCC LLC |
Sep 2014 |
|
105 Nos of 600mm dia Displacement Piles - Work Completed |
Proposed Vehicle Distribution Centre Phase 2 |
Sohar |
Saud Bahwan Automotive |
Design Unit |
Design Unit |
Premier International Project LLC |
Feb-15 |
90 Days |
1782 Piles of 600mm dia Bored Cast In Situ Piles by Temp Casing and CFA method – Work Completed |
Proposed Sea Water Relieving Structure |
Sohar |
ORPIC |
Sarens NV |
Sarens NV |
Sarens NV |
Jan-15 |
10 Days |
38 Piles of 600mm dia Bored Cast In Situ Piles by CFA method – Work Completed |
Proposed Al Khuwair Hospitality Hotel |
Muscat |
ASAAS |
AWS |
AWS |
Deebaj National Enterprises LLC |
Feb-15 |
60 Days |
Shoring with Contiguous Piles 600mm dia for 156 LM with maximum 8m excavation – Work Completed |
Proposed Pump Foundations in Sohar Refinery Improvement Project |
Sohar |
ORPIC |
Daelim Petrofac |
Douglas OHI LLC |
Douglas OHI LLC |
May-16 |
01 WEEK |
Drilling 600mmdia holes with permanent casing for the pump foundations - Work Completed |
Proposed Construction of Roads, Infrastructure and Building Works at the Commercial Pre-Gate, Gates & Inspection Zone area |
Duqm |
SEZAD |
Royal Haskoning - Khatib Alami JV |
Royal Haskoning - Khatib Alami JV |
United Gulf Contracting Company |
Oct-16 |
07 Months |
1039 Nos of 600mm dia piles of lengths ranging from 12m to 16m – Work under progress |
Proposed Residential Commercial Building in Plot 218, Phase 1, Bausher |
Bausher |
Salin Said Hamed Al Fanna Al Areimi |
Capital Engineering Consulting |
Capital Engineering Consulting |
Abu Maather Trading and Contracting Co LLC |
Jul-16 |
02 Months |
Shoring with Contiguous Piles 600mm dia for 153 LM with maximum 8m excavation – Work Completed |
Proposed Plot No 832 Block 20 NE, Al Ghubrah North (Near Chedi Hotel), Muscat |
Ghubra |
Hamad Mohammed Abdulla Al Rodhan |
Space Designers LLC |
Space Designers International LLC |
Star Development LLC |
Nov-16 |
02 Months |
188 Nos of 600mm Dia 16m long Bored Cast In Situ Piles by CFA Method & 06 Nos of Dewatering wells Installations – Work Completed |
Commercial Building at Al Khuwair plots 171, Phase-4, Bausher, Muscat – Sultanate of Oman. |
Bausher |
Mohammed and Qaboos Abdulla Al Khonji |
EHAF Consulting Engineers |
EHAF Consulting Engineers |
Al Binaa Construction and Industry LLC |
Apr-17 |
02 Months |
Shoring with Contiguous Piles of Dia 750mm & 600mm for a total of 112m - – Work Completed |
Proposed Construction of Roads, Infrastructure Works at the Government Berth Area – Package IP4, Duqm |
Duqm |
SEZAD |
Royal Haskoning - Khatib Alami JV |
Royal Haskoning - Khatib Alami JV |
Combined Group Contracting Co Ksc |
Mar-17 |
04 Months |
Shoring with Sheet Piling Installation and Extraction of 1375m total with SP3W Sheet Piles - – Work under progress |
Proposed Wireless Broadband Network Telecom Project II Tower SBT_BR24, Al Haradi, Barka |
Barka |
Omantel |
Sycone |
Sycone |
Tawoos Power and Telecommunications LLC |
Mar-17 |
01 Week |
Bored Cast In Situ Piles of 750mm Dia with CFA method 08 Nos for 40m High Towers – Work Completed |
Proposed Building on Plot 1749 Phase 3 at Al Khuwair Bausher |
Al Khuwair |
Warith Bin Mubarak |
AWS |
AWS |
Mint Project International LLC |
Aug-17 |
01 Month |
Shoring with Contiguous Piles of Dia 750mm & 600mm for a total of 112m - – Work under progress |
Proposed Telecommunication Tower at Raysut Navy, Salalah |
Salalah |
Ministry of Defence |
Al Hatmy/Ericsson |
Al Hatmy/Ericsson |
Khurshid Trading & Cont |
Jul-17 |
01 Week |
Bored Cast In Situ Piling of 750mm Dia Piles with LDA method 04 Nos - Work Completed |
Proposed Commercial Building in Plot 2 Duqm |
Duqm |
Sheik Rashid |
CPEC |
CPEC |
Sheik Rashid |
Jun-17 |
08 Weeks |
Bored Cast In Situ Piling of 750 and 900mm Dia Piles with LDA method - Work in Hand |